DATALINKUPDATE command

Synchronizes the linked data in tables in the current drawing with data in the linked source file.

BricsCAD Lite; BricsCAD Pro; BricsCAD Mechanical; BricsCAD BIM

Icon:

Method

There are two methods to use DATALINKUPDATE command:

  • Update the data link existing in a table in the drawing.
  • Update the linked data in an external file.

Options within the command

Update data link
Updates the linked data in a table in the drawing with data that has been changed in the external source file.
Write data link
Updates the linked data in an external file with data that has been changed in a table in the drawing.
Select objects
Prompts you to select table entities.
Update all
Synchronizes all linked data in all tables in the drawing.