DATALINKUPDATE command
Synchronizes the linked data in tables in the current drawing with data in the linked source file.
![BricsCAD Lite; BricsCAD Pro; BricsCAD Mechanical; BricsCAD BIM](https://static.bricsys.com/help/images/V23/en_US/command-reference-lite-pro-mechanical-bim.png)
Icon:
Method
There are two methods to use DATALINKUPDATE command:
- Update the data link existing in a table in the drawing.
- Update the linked data in an external file.
Options within the command
- Update data link
- Updates the linked data in a table in the drawing with data that has been changed in the external source file.
- Write data link
- Updates the linked data in an external file with data that has been changed in a table in the drawing.
- Select objects
- Prompts you to select table entities.
- Update all
- Synchronizes all linked data in all tables in the drawing.